Cleaning Of Internal Parts Of The Wash Out Pipeline Of The Esr In The University Campus, Including Removing, Cleaning, And Reinstalling A 250 Mm Thick Di Wash Out Pipeline. Total Length Is 25 Meters (vertical 20 Meters And Horizontal 5 Meters).
apartmentSWAMI RAMANAND TEERTH MARATHWADA UNIVERSITY
Bid Value
Refer Doc
EMD
Refer Doc
Location
Nanded, Maharashtra
Deadline
09 Nov 2026