Bidzen.ai Logo
Productkeyboard_arrow_down

Product

descriptionTender SummaryTransform complex 200-page RFPs into actionable executive summaries in seconds.warningAI Tender Risk AnalyzerAutomatically flag hidden legal, financial, and technical traps before you commit.ruleTender Contradiction FinderComing SoonIdentify conflicting requirements across documents to avoid costly submission errors.paymentsPrice EstimationComing SoonData-driven pricing insights to help you position your bid for maximum win probability.monitoringCompetitor TrackingComing SoonUncover winning patterns and strategic moves of your competitors across past tenders.chatQ&A ChatbotAsk any question about a complex RFP and get instant, accurate answers with citations.search_insightsIntelligent Tender DiscoverySearch documents intelligently by meaning, not just keywords, to find critical clauses instantly.edit_noteTender Document GeneratorComing SoonDraft authority-grade technical responses and proposals perfectly mapped to requirements.linkTender PDF Clause ReferencingEvery AI output is mapped back to the source PDF, ensuring absolute auditability and trust.analyticsBidFit Score EngineComing SoonIdentify high-probability bids instantly with proprietary scores based on your business profile.checklistTender EligibilityMake confident bid decisions before committing time, money, and resources.
Bidzen feature dashboard preview

Win the right bids faster

Explore AI tools for synopsis, risk, pricing, search, drafting, and go/no-go decisions.

View All Featuresarrow_forward

Industry Tenders

foundationEPC & InfrastructureNHAI, CPWD & MoRTHengineeringConstruction (AEC)General & AEC contractorssolar_powerRenewable EnergySECI, NTPC & state DISCOMsaccount_balancePublic Sector / PSUsGeM, CPPP & PSU vendorsterminalIT ConsultingRFP automation & OEMprecision_manufacturingManufacturingSupply tenders & RFQsconversion_pathLogistics & Supply ChainFreight, lane & SLA detailspartner_exchangeConsulting FirmsStrategic advisory bidsshieldAerospace & DefenseDRDO & high-security contractsstoreMSMEsGovernment & GeM tenders for MSEs
Platform Power

Natively Tailored Scopes

Every industry has distinct rules, criteria, and compliance. Bidzen is built for precision, recognizing native conventions instead of generic summaries.

Use Cases

Alternative Guides

ContraVault Alternativearrow_forwardLoopio Alternativearrow_forwardQuickBid Alternativearrow_forwardResponsive Alternativearrow_forward

Side-by-Side Comparisons

Bidzen vs 1upBidzen vs ContraVaultBidzen vs GovlyBidzen vs LoopioBidzen vs QuickBidBidzen vs ResponsiveBidzen vs SequestoBidzen vs Unanet

Company

About Usarrow_forwardInsightsarrow_forward

Latest Insights

April 2026Bidzen.ai Joins NVIDIA Inception to Accelerate the Future of AI-Powered Bid ManagementView all insightsarrow_forward
TeamContact
Login
Use Cases
TeamContactLogin

Tenders By State

Andaman And Nicobar Islands Tenders|Andhra Pradesh Tenders|Arunachal Pradesh Tenders|Assam Tenders|Bihar Tenders|Chandigarh Tenders|Chhattisgarh Tenders|Dadra And Nagar Haveli,daman And Diu Tenders|Delhi Tenders|Goa Tenders|Gujarat Tenders|Haryana Tenders|Himachal Pradesh Tenders|Jammu And Kashmir Tenders|Jharkhand Tenders|Karnataka Tenders|Kerala Tenders|Ladakh Tenders|Lakshadweep Tenders|Madhya Pradesh Tenders|Maharashtra Tenders|Manipur Tenders|Meghalaya Tenders|Mizoram Tenders|Nagaland Tenders|Odisha Tenders|Puducherry Tenders|Punjab Tenders|Rajasthan Tenders|Sikkim Tenders|Tamil Nadu Tenders|Telangana Tenders|Tripura Tenders|Uttar Pradesh Tenders|Uttarakhand Tenders|West Bengal Tenders

Tenders By Organisation

Indian Army Tenders|Public Works Department Tenders|Zilla Parishad Tenders|Local Self Government Department Tenders|Directorate Of Local Bodies Up Tenders|Military Engineer Services Tenders|Urban Administration And Development Department Tenders|Public Health Engineering Department Tenders|Panchayat Samiti Tenders|South Central Railway Tenders|Western Railway Tenders|Eastern Railway Tenders|Northern Railway Tenders|Indian Air Force Tenders|Central Railway Tenders|Panchayati Raj Department Tenders|Southern Railway Tenders|South Eastern Railway Tenders

Tenders By Department

Department Of Military Affairs Tenders|Department Of Defence Production Tenders|Indian Railways Tenders|Department Of Atomic Energy Tenders|Department Of Defence Tenders|Department Of Heavy Industry Tenders|Coal India Limited Tenders|Department Of School Education And Literacy Tenders|Department Of Higher Education Tenders|Indian Oil Corporation Limited Tenders|Department Of Food And Public Distribution Tenders|Department Of Health And Family Welfare Tenders|Department Of Defence Research Development Tenders|Department Of Panchayati Raj Tenders|Urban Development Department Uttar Pradesh Tenders|Department Of Fertilizers Tenders|Department Of Agricultural Research And Education Dare Tenders|Department Of Financial Services Tenders

Tenders By Industry

Construction Tenders|Electrical Tenders|Furniture Tenders|Railway Tenders|Textile Tenders|Chemical Tenders|Irrigation Tenders|It Tenders|Agriculture Tenders|Healthcare Tenders|Energy Tenders|Education Tenders

Bidzen.ai logo
Nvidia logo

Bidzen.ai provides generative intelligence architectures for high-stakes bidding, automating RFP shredding, risk analysis, and proposal drafting.

Privacy Policy•Terms of Use•LinkedIn

© 2026 Bidzen.ai. All rights reserved.

AI Platform Insights

lockGDPR Compliant
domainLegal Company: GeMTech PARAS Solutions Pvt. Ltd.
emailEmail: helpdesk@bidzen.ai
  1. Home
  2. chevron_rightTenders
  3. chevron_rightOrganisation Wise Tenders
  4. chevron_rightRail Coach Factory Tenders
Rail Coach Factory Tenders — Updated November 20261 Rail Coach Factory tender closing in under 3 days — review & act now

Latest Rail Coach Factory Tenders — Updated Daily

Access active Rail Coach Factory tender notices and let AI check your eligibility before you commit. Don't let documentation errors lead to rejection — 40% of bids are rejected at the technical stage.

Active Rail Coach Factory Tenders

Source:ireps.gov.incloseClear all

account_balanceDepartment

  • Department Of Military Affairs0
  • Department Of Defence Production0
94
Rail Coach Factory Tenders Tracked
354+
Clients Across India
90%
Faster RFP Reading
80%
Faster Go/No-Go Decisions
84%
Fewer Clarification Queries

Bidzen aggregates live Rail Coach Factory tenders across all regions and project sites into one searchable platform. Every active tender is indexed, filtered, and matched to your company profile automatically. Stop manually checking portals — let the data come to you.

verifiedFree AI Bid Eligibility Checkarrow_forward
The Problem

Why Rail Coach Factory Tenders Get Rejected at the Technical Stage

These are the most common rejection reasons bidding teams run into — all avoidable when the tender is read properly before you commit.

📄

Documentation Errors

Missing certificates, expired registrations or wrong formats are the top reason Rail Coach Factory bids are rejected before evaluation even starts.

🎯

Eligibility Missed

Turnover, similar-work and experience thresholds buried across tender volumes are misread, and estimating hours go into bids the company could never win.

⏳

Corrigenda & Deadlines

Dates, EMD terms and specifications change through corrigenda. Bids built on the original notice miss the revised requirements.

The Solution

Everything You Need to Win Rail Coach Factory Tenders — In One Platform

From discovery to Go/No-Go, Bidzen reads every tender the moment it lands and tells you whether it is worth your team's time.

🔎

Every Live Tender, One Search

All active Rail Coach Factory tenders from GeM, CPPP and e-procurement portals are indexed daily and searchable by keyword, value and location.

✅

AI Eligibility & Fit Score

Bidzen reads the eligibility clauses and matches them to your company profile — a Go/No-Go verdict in minutes, not days.

🧠

Synopsis, Risks & Contradictions

A structured synopsis of every tender document, with hidden risks and conflicting clauses flagged before you commit.

Our Process

How It Works — 4 Simple Steps

1

Search & Shortlist

Filter live tenders by keyword, buyer, value and location — or let alerts bring them to you.

2

AI Eligibility Check

Bidzen matches turnover, experience and certification clauses against your company profile.

3

Synopsis & Risk Review

Every volume, annexure and corrigendum is condensed into one structured brief with risks flagged.

4

Draft, Submit & Win

Build the compliance checklist, draft the response and submit before the deadline — with certainty.

FAQ

Frequently Asked Questions about Rail Coach Factory Tender Bidding

How do I track new Rail Coach Factory tenders?expand_more
This page lists every live Rail Coach Factory tender the moment it is indexed. Log in to Bidzen to save the search and receive alerts whenever Rail Coach Factory publishes a new tender or corrigendum.
How to register as a vendor with Rail Coach Factory?expand_more
Submit the registration form along with your company registration documents, GST certificate, PAN and relevant experience certificates on the Rail Coach Factory vendor portal (or GeM, where Rail Coach Factory procures through it). Bidzen's eligibility check shows which registrations each tender expects.
What is the EMD requirement for Rail Coach Factory tenders?expand_more
EMD is typically 2–3% of the estimated tender value, submitted as a Bank Guarantee from a scheduled commercial bank or through the portal. The exact amount, format and exemptions (MSE, startup) are stated in the NIT and surfaced in the Bidzen synopsis.

Ready to win your next Rail Coach Factory tender?

Join the bidding teams using Bidzen.ai to read every tender in minutes, check eligibility instantly and bid with absolute certainty.

Login to Bidzen
  • Department Of Atomic Energy0
  • Indian Railways0
  • Department Of Health And Family Welfare0
  • Department Of Defence0
  • Department Of Heavy Industry0
  • Department Of Higher Education0
  • location_onState

    • Uttar Pradesh1
    • West Bengal0
    • Maharashtra0
    • Tamil Nadu14
    • Madhya Pradesh0
    • Gujarat0
    • Rajasthan0
    • Kerala0

    publicSource

    • bidplus.gem.gov.in0
    • etender.up.nic.in0
    • tenders.wb.gov.in0
    • tntenders.gov.in0
    • mptenders.gov.in0
    • defproc.gov.in0
    • etenders.kerala.gov.in0
    • eprocure.gov.in0

    Showing 76–94 of 94 active tenders

    notifications_activeGet alerts for this search
    SortRelevanceClosing soonNewestHighest value
    tuneFilter resultsexpand_more

    account_balanceDepartment

    • Department Of Military Affairs0
    • Department Of Defence Production0
    • Department Of Atomic Energy0
    • Indian Railways0
    • Department Of Health And Family Welfare0
    • Department Of Defence0
    • Department Of Heavy Industry0
    • Department Of Higher Education0

    location_onState

    • Uttar Pradesh1
    • West Bengal0
    • Maharashtra0
    • Tamil Nadu14
    • Madhya Pradesh0
    • Gujarat0
    • Rajasthan0

    publicSource

    • bidplus.gem.gov.in0
    • etender.up.nic.in0
    • tenders.wb.gov.in0
    • tntenders.gov.in0
    • mptenders.gov.in0
    • defproc.gov.in0
    tag02261629_20261110

    Supply Of Multi-core Cables Of Seven Types

    schedule7d left

    apartmentRail Coach Factory

    Bid Value

    Refer Doc

    EMD

    Refer Doc

    Location

    Kapurthala, Punjab

    Deadline

    10 Nov 2026

    Non-GeMireps.gov.inView & analyse in Bidzenarrow_forward
    chevron_leftPrevious…234Nextchevron_right
  • Kerala0
  • etenders.kerala.gov.in
    0
  • eprocure.gov.in0
  • tag07261369_20261106

    Supply Of Mig Brazing Wire Dia 0.8mm In Spool Of Weight 12.5 Kg.approx., As Per Drawing: Din 1733 June 1988: Sg-cual 8 Or Equivalent [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]

    schedule3d left

    apartmentRail Coach Factory

    Bid Value

    Refer Doc

    EMD

    Refer Doc

    Location

    Kapurthala, Punjab

    Deadline

    06 Nov 2026

    Non-GeMireps.gov.inView & analyse in Bidzenarrow_forward
    tag04261039_20261116

    Supply Of Ferritic Steel Sheet 5x1250 X 3000 Mm., As Per Drawing: Rdso Spec No.c-k201, Grade X2crni12 (409m) Table 1&2. Heat Treatment Condition 2d As Per Table-5., Packing Instruction: Stainless Steel Sheets, Coils And Plates:- (a) Stainless Steel (austenitic & Ferritic Steel) Coils. The Coil Shall Be Protected In Reasonably Good Condition To Withstand Normal Handling Hazard During Transit With The Following Provision As The Barest Minimum: I) Coil Should Be Wrapped With A Layer Of Water Proof Paper Through Out Whole Length. Ii) Coil Should Be Wrapped With A Layer Of Biodegradeable Sheet. Iii) Outer & Inner Of Coil Should Be Wrapped With Gi Sheet. Iv) Side Of The Coil Should Be Covered With Card Board Sheet. V) After This Whole Coil Should Be Wrapped With Biodegradeable Plastic Sheet Of Suitable Thickness. Vi) The Inner Edge Of The Coil Should Be Protected By Gi Ring Followed By Another Iron Ring. Vii) Outer Edge Of The Coil Should Be Wrapped With Gi Ring. Viii) Coil Should Be Securely Strapped With Minium 5 Steel Bands Through The Eyes Of The Coil And Minium 3 Steel Bands On The Circumference Of The Eye. Ix) Whole Coil Should Be Mounted On Wooden Blocks For Easy Lifting/stacking. X) The Sheets In Coil Form For Thickness 2mm And Above Shall Have: Inner Dia Of Coil 450-800mm Outer Dia Of Coil 1000-1300mm Weight Of Coil 2.4 - 10 Tonnes Xi) The Sheets In Coil Form For Thickness Below 2mm Shall Have: Inner Dia Of Coil 450-650mm Outer Dia Of Coil 1000-1300mm Weight Of Coil5.0 - 10 Tonnes. (b) Stainless Steel (austenitic & Ferritic Steel Plates/sheets) I) The Sheets/plates Shall Be Supplied In Bundles Of Optimum Weight: 2mt+/-10% & Each Sheet/plate Shall Be Seprated With A Layer Of Water Proof Paper, After This The Whole Bundle Should Be Wrapped With Double Layer Of Water Proof Paper And A Biodegradeable Plastic Sheet Of Suitable Thickness. A Metal Protection In Edges Should Also Be Provided.

    schedule13d left

    apartmentRail Coach Factory

    Bid Value

    Refer Doc

    EMD

    Refer Doc

    Location

    Kapurthala, Punjab

    Deadline

    16 Nov 2026

    Non-GeMireps.gov.inView & analyse in Bidzenarrow_forward
    tag13265181B_20261111

    Supply Of Distributor To Cover Oil Tube For Godrej Fork Lift Truck Conforming To Part Noo. 02010319 Of M/s. Godrej [ Warranty Period: 12 Months After The Date Of Delivery ] ]

    schedule8d left

    apartmentRail Coach Factory

    Bid Value

    Refer Doc

    EMD

    Refer Doc

    Location

    Tirupattur, Tamil Nadu

    Deadline

    11 Nov 2026

    Non-GeMireps.gov.inView & analyse in Bidzenarrow_forward
    tag13265197A_20261125

    Supply Of Portable Fire Extinguisher Co2 Type (capacity 45 Kg) As Per Is Is16018:2012 [ Warranty Period: 30 Months After The Date Of Delivery ] ]

    schedule22d left

    apartmentRail Coach Factory

    Bid Value

    Refer Doc

    EMD

    Refer Doc

    Location

    Tirupattur, Tamil Nadu

    Deadline

    25 Nov 2026

    Non-GeMireps.gov.inView & analyse in Bidzenarrow_forward
    tag02261500_20261111

    Supply Of Papis For Non Ac Amrit Bharat Coaches. Note:- 1. Dimension Of Papis Equipment As Per Design L. No. Md46291 Dated 06.08.2025, 06.10.2025 & 11.11.2025. 2. Papis To Be Supplied In Multiple Of 22 Nos. I.e. On Rake Basis (one Rake Consists Of 22 Coaches With Composition: Gs=11, Scn=08, Slr=02 & Hot Buffet=01). 3. Safety Clause Must Be Followed According To Annexure-a Of Dy.cple-ii L.no.rcf/emp/1 Dated. 01.04.2025., As Per Drawing: Rdso/cg-18001 Rev.2 With Amendment-1(ref. Md46291 Dated 20.01.2026), Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 78 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]

    schedule8d left

    apartmentRail Coach Factory

    Bid Value

    Refer Doc

    EMD

    Refer Doc

    Location

    Kapurthala, Punjab

    Deadline

    11 Nov 2026

    Non-GeMireps.gov.inView & analyse in Bidzenarrow_forward
    tag17261308A_20261116

    Supply Of Set Of Luggage Compartment Panel Arrgt. For Lhb Slr Amrit Bharat Coaches., As Per Drawing: Lslrd-4-4-003 Alt B, Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] ]

    schedule13d left

    apartmentRail Coach Factory

    Bid Value

    Refer Doc

    EMD

    Refer Doc

    Location

    Kapurthala, Punjab

    Deadline

    16 Nov 2026

    Non-GeMireps.gov.inView & analyse in Bidzenarrow_forward
    tag02261688_20261125

    Supply Of 50 Sq.mm Thin Walled Flex.elast.cable(yellow),with Cu.cond, Up To 750v., As Per Drawing/specification : Elrs/spec/elc/0019,rev-4. As Per Rdso Letter No.el/2.2.37 Dt.23/03/2009, Packing Instruction: Packing As Per Drawing, Quality Plan: N.a. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]

    schedule22d left

    apartmentRail Coach Factory

    Bid Value

    Refer Doc

    EMD

    Refer Doc

    Location

    Kapurthala, Punjab

    Deadline

    25 Nov 2026

    Non-GeMireps.gov.inView & analyse in Bidzenarrow_forward
    tag14261135_20261123

    Supply And Charging Of Drdo Anaerobic Bacteria In Coach Toilet At Rcf, As Per Drawing/specification: As Per Rdso Specification No. - Rdso/2013/cg-12 Ver-1.0. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]

    schedule20d left

    apartmentRail Coach Factory

    Bid Value

    Refer Doc

    EMD

    Refer Doc

    Location

    Kapurthala, Punjab

    Deadline

    23 Nov 2026

    Non-GeMireps.gov.inView & analyse in Bidzenarrow_forward
    tag02261578_20261030

    Corrigendum : Supply Of Pre Wired Pump Controller &amp; Mcb Panel, As Per Drawing: Train18/tc/ac-7-5-003 (latest), Packing Instruction: Alternator,rru, Erru &amp;accessories, Transformer,bulk Inverters , Battery, Charger, Self Priming Monoblock Pump, Inverter, Change Over Control Box Etc: Suitably Covered With Biodegradable Transparent Polythene And Packed In Wooden Cage: Bottom Frame To Be Made Of Wooden Planks 20mm Thick &amp;should Have Support Of At Least 3 Wooden Battons Of Size 100x100mm Of Suitable Length To Facilitate Lifting By Fork Lifter. Each Panel To Be Packed In Wooden Cage Of Suitable Dimensions Made Outof Wooden Strips Of 20x100mm Size. Gap Between Each Strip Should Not Be More Then 100mm. The Material Used For Product Packaging Shall Be Eco-friendly.a List Should Be Pasted On Each Wooden Cage Showing Order No, Pl No, Description Of The Item, Drg. No/ Spec. No ,qty, Firm's Name &amp;address And Date Of Despatch Etc. Note- 1) Firms Have Option To Provide Qr Code. For Linkage Of Po, The Cardboard Box Shall Carry A Qr Code Having Details As Listed Below: A) Name Of The Manufacturer <manuname> B) Purchaseorder Number <pono> C) Purchaseorder Date <podt> D) Uniqueserial Number (or Lot Number For Bulk Items) Of The Manufacturer <manusno>or <manulno> E) Dateof Manufacture <manudate> F) Deliverychallan No. <delchalno> G) Deliverychallan Date <delchaldt> 2.the Qr Code Shall Be As Per Iso/iec 18004 Model2 And The Data Shall Be Available As Xmlusing The Tags Detailed Above. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]

    schedule15d left

    apartmentRail Coach Factory

    Bid Value

    Refer Doc

    EMD

    Refer Doc

    Location

    Kapurthala, Punjab

    Deadline

    18 Nov 2026

    Non-GeMireps.gov.inView & analyse in Bidzenarrow_forward
    tag02261524_20261028

    Corrigendum : Supply, Testing And Commissioning (including All Connections And Dressing W/o Loading) Of Switch Board Cabinet, As Per Drawing: Edts134,rev-d,am-5,cor.-2,rcf Annex. A &amp; C, Packing Instruction: Electrical Panels To Be Protected With Transparent Biodegradable Polythene Bag/sheets Thickness Of 0.1 Mm Or An Antistatic Bag Of 350 To 400 Gauge (100 Micron Approx.) On All Sides Of Panel &amp;panel Shall Be Packed In Transport Worthy Wooden Cage. Bottom Frame To Be Made Of Wooden Planks 20mm Thick &amp;should Have Support Of At Least 3 Wooden Batons Of Size 100x100mm Of Suitable Length To Facilitate Lifting By Fork Lifter &amp;secure Properly With Suitable Packing To Avoid In-transit Damage. Each Panel To Be Packed In Transport Worthy Wooden Cage Of Suitable Dimensions Made Out Of Wooden Strip Of 20x100 Mm Size. Gap Between Each Strips Should Not Be More Then 100mm.a List Should Be Pasted On Each Wooden Cage Showing Order No, Pl No, Description, Drg /spec. No, Qty, Firm'name &amp;address, Consignee Name, Date Of Dispatch, Top Bottom Arrow Mark Etc. Note- 1) Firms Have Option To Provide Qr Code. For Linkage Of Po, The Cardboard Box Shall Carry A Qr Code Having Details As Listed Below: A)name Of The Manufacturer <manuname> B)purchase Order Number <pono> C)purchase Order Date <podt> D)unique Serial Number (or Lot Number For Bulk Items) Of The Manufacturer <manusno>or <manulno> E)date Of Manufacture <manudate> F)delivery Challan No. <delchalno> G)delivery Challan Date <delchaldt> 2. The Qr Code Shall Be As Per Iso/iec 18004 Model2 And The Data Shall Be Available As Xml Using The Tagsdetailed Above. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]

    schedule14d left

    apartmentRail Coach Factory

    Bid Value

    Refer Doc

    EMD

    Refer Doc

    Location

    Kapurthala, Punjab

    Deadline

    17 Nov 2026

    Non-GeMireps.gov.inView & analyse in Bidzenarrow_forward
    tag13265258_20261116

    Supply Of Railway Coach Painting Booth, Spec No- Mech/m&amp;p/4000/02 Rev-nil, Date: 24.07.2025 [ Warranty Period: 30 Months After The Date Of Delivery ] ]

    schedule13d left

    apartmentRail Coach Factory

    Bid Value

    Refer Doc

    EMD

    Refer Doc

    Location

    Tirupattur, Tamil Nadu

    Deadline

    16 Nov 2026

    Non-GeMireps.gov.inView & analyse in Bidzenarrow_forward
    tag02261578_20261118

    Supply Of Pre Wired Pump Controller &amp; Mcb Panel, As Per Drawing: Train18/tc/ac-7-5-003 (latest), Packing Instruction: Alternator,rru, Erru &amp;accessories, Transformer,bulk Inverters , Battery, Charger, Self Priming Monoblock Pump, Inverter, Change Over Control Box Etc: Suitably Covered With Biodegradable Transparent Polythene And Packed In Wooden Cage: Bottom Frame To Be Made Of Wooden Planks 20mm Thick &amp;should Have Support Of At Least 3 Wooden Battons Of Size 100x100mm Of Suitable Length To Facilitate Lifting By Fork Lifter. Each Panel To Be Packed In Wooden Cage Of Suitable Dimensions Made Outof Wooden Strips Of 20x100mm Size. Gap Between Each Strip Should Not Be More Then 100mm. The Material Used For Product Packaging Shall Be Eco-friendly.a List Should Be Pasted On Each Wooden Cage Showing Order No, Pl No, Description Of The Item, Drg. No/ Spec. No ,qty, Firm's Name &amp;address And Date Of Despatch Etc. Note- 1) Firms Have Option To Provide Qr Code. For Linkage Of Po, The Cardboard Box Shall Carry A Qr Code Having Details As Listed Below: A) Name Of The Manufacturer <manuname> B) Purchaseorder Number <pono> C) Purchaseorder Date <podt> D) Uniqueserial Number (or Lot Number For Bulk Items) Of The Manufacturer <manusno>or <manulno> E) Dateof Manufacture <manudate> F) Deliverychallan No. <delchalno> G) Deliverychallan Date <delchaldt> 2.the Qr Code Shall Be As Per Iso/iec 18004 Model2 And The Data Shall Be Available As Xmlusing The Tags Detailed Above. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]

    schedule15d left

    apartmentRail Coach Factory

    Bid Value

    Refer Doc

    EMD

    Refer Doc

    Location

    Kapurthala, Punjab

    Deadline

    18 Nov 2026

    Non-GeMireps.gov.inView & analyse in Bidzenarrow_forward
    tag17251162E_20261127

    Supply,installation,testing And Commissioning Of Automatic Smoke/fire Detection With Alarm System On Retro Fitment Basis In Existing 3 Phase Emu Rakes Over Indian Railways(details As Per Annexure-i)(1set For 1 Emu Rake Of 12 Car Formation) Note-safety Clause Must Be Followed According To Annexure-a Of Dy.cple-ii L.no.rcf/emp/1 Dated.01.04.2025) , As Per Drawing: Edml-210, Corr-1 &amp; Am-1, (type-1a), Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] ]

    schedule24d left

    apartmentRail Coach Factory

    Bid Value

    Refer Doc

    EMD

    Refer Doc

    Location

    Kapurthala, Punjab

    Deadline

    27 Nov 2026

    Non-GeMireps.gov.inView & analyse in Bidzenarrow_forward
    tag07261293A_20261126

    Supply Of Set Of Hex Hd Bolt/screws For Bogies Of Spart Coaches. Coating As Per Mdts-057. Special Condition : There Will Be Minor Modification In Design, Firm May Be Advisedto Collect Final Drawings Before Manufacturing., As Per Drawing: Mplvbbogbolts Version 0, Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] ]

    schedule23d left

    apartmentRail Coach Factory

    Bid Value

    Refer Doc

    EMD

    Refer Doc

    Location

    Kapurthala, Punjab

    Deadline

    26 Nov 2026

    Non-GeMireps.gov.inView & analyse in Bidzenarrow_forward
    tag02261572_20261102

    Corrigendum : Design, Supply, Installation, Testing &amp; Commissioning Of Inter Vehicular Coupler (ivc), System For Multiple Unit Operation (mu), Hog Operation, Passenger Communication (etb) And Emergency Feed Terminal (eft) For Push Pull Rake On Lhb Platform., As Per Drawing: Icf Spec No.icf/elec/970 Rev.1, Cs:01 Cs:02 &amp; Cs:03,cs:04, As Per Annexure-2, Packing Instruction: Suitably Covered With Biodegradable Transparent Polythene And Packed In Wooden Box.the Material Used For Product Packaging Shall Be Eco-friendly .each Packing Shall Be Stenciled/labeled Handle With Care, Consignee Name, Order No,pl's No , Description Of Item, Batch No,drg/spec No, Qty,firm's Name, &amp;date Of Despatch Etc. Note- 1) Firms Have Option To Provide Qr Code. For Linkage Of Po, The Cardboard Box Shall Carry A Qr Code Having Details As Listed Below: A)nameof The Manufacturer <manuname> B)purchaseorder Number <pono> C)purchaseorder Date <podt> D)uniqueserial Number (or Lot Number For Bulk Items) Of The Manufacturer <manusno>or <manulno> E)dateof Manufacture <manudate> F)deliverychallan No. <delchalno> G)deliverychallan Date <delchaldt> 2.the Qr Code Shall Be As Per Iso/iec 18004 Model2 And The Data Shall Be Available As Xml Using The Tags Detailed Above. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]

    schedule9d left

    apartmentRail Coach Factory

    Bid Value

    Refer Doc

    EMD

    Refer Doc

    Location

    Kapurthala, Punjab

    Deadline

    12 Nov 2026

    Non-GeMireps.gov.inView & analyse in Bidzenarrow_forward
    tag02261589_20261102

    Corrigendum : Supply Of Harness Of Under Frame And Roof Arrangement For Lhb Eog Gs Non Ac Coaches For Amrit Bharat Rake., As Per Drawing: Edts456, Rev.'a', Packing Instruction: Cable Harness: Complete One Coach Set Cable Harness To Be Protected With Biodegradable Transparent Polythene Sheet And Packed In A Wooden Box. Soft Eco-friendly Packing Material Hay,straw, Etc Be Provided Inside The Wooden Box To Protect Any Damage To Cable Insulation While Packing/unpacking.bottom Frame To Be Made Of Wooden Planks 20mm Thick &amp; Should Have Support Of Atleast 3 Wooden Battons Of Size 100x100mm Of Suitable Lengthto Facilitate Lifting By Fork Lifter. Rigid Pvc Conduit Supplied Loose Along With Harness Should Be Packed As Per Instructions .the Material Used For Product Packaging Shall Be Eco-friendly.a List Should Be Pasted On Each Packing Showing Order No ,pl No, Description Of The Item, Drg.no/spec.no, Qty , Firm's Name &amp;address And Date Of Despatch Etc. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]

    schedule17d left

    apartmentRail Coach Factory

    Bid Value

    Refer Doc

    EMD

    Refer Doc

    Location

    Kapurthala, Punjab

    Deadline

    20 Nov 2026

    Non-GeMireps.gov.inView & analyse in Bidzenarrow_forward
    tag02261250A_20261102

    Corrigendum : Supply Of Harness Of Under Frame And Roof Arrangement For Lhb Eog Slrd Non Ac Coaches For Amrit Bharat Rake., As Per Drawing: Edts458, Rev-nil, Am-1, Packing Instruction: Cable Harness: Complete One Coach Set Cable Harness To Be Protected With Biodegradable Transparent Polythene Sheet And Packed In A Wooden Box. Soft Eco-friendly Packing Material Hay,straw, Etc Be Provided Inside The Wooden Box To Protect Any Damage To Cableinsulation While Packing/unpacking.bottom Frame To Be Made Of Wooden Planks 20mm Thick &amp; Should Have Support Of Atleast 3 Wooden Battons Of Size 100x100mm Of Suitable Length To Facilitate Lifting By Fork Lifter. Rigid Pvc Conduit Supplied Loose Along With Harness Should Be Packed As Per Instructions .the Material Used For Product Packaging Shall Be Eco-friendly.a List Should Be Pasted On Each Packing Showing Order No ,pl No, Description Of The Item, Drg.no/spec.no, Qty , Firm's Name &amp;address And Date Of Despatch Etc. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]

    schedule17d left

    apartmentRail Coach Factory

    Bid Value

    Refer Doc

    EMD

    Refer Doc

    Location

    Kapurthala, Punjab

    Deadline

    20 Nov 2026

    Non-GeMireps.gov.inView & analyse in Bidzenarrow_forward
    tag17261528A_20261111

    Supply Of Mounting Frame For Compartment Doors For Lhb Ac Hot Buffet Coaches, As Per Drawing: Le56119 Alt C, Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] ]

    schedule8d left

    apartmentRail Coach Factory

    Bid Value

    Refer Doc

    EMD

    Refer Doc

    Location

    Kapurthala, Punjab

    Deadline

    11 Nov 2026

    Non-GeMireps.gov.inView & analyse in Bidzenarrow_forward